2014-09-25

北海道ストローベイルハウス~Kさん邸 K-san's Straw Bale Home in Hokkaido

今年に携わったストローベイルハウスの様子です。北海道にあるKさんの個人住宅です。ビオプラス西條デザインさんによって設計され、ストローベイル建築そうだん@hokkaidoがベイル積みを計画し、ベイル壁塗りが野田左官店の指導の下、ワークショップ形式で行いました。
In May, June and September I helped with the construction of K-san's Straw Bale Home in Hokkaido. The home was designed by BIO+ Saijo Design, construction of the straw bale walls was organized by Hokkaido's straw bale building association, and plastering was lead by Noda Plaster Works.
 
今まで携わったストローベイル現場の中で今回のワークショップがもっとも効率的で、北海道や寒冷地域でのストローベイル建築の可能性を強く感じました。施主さんをはじめ、皆さん、ありがとうございました。
The stacking and plastering of the straw bale walls was done in a workshop format. Of all the straw bale builds I've been involved in, this was probably the most efficient. Many thanks to all those involved.
 
約300個のベイルを4日間で積み上げました
More than 300 bales stacked in four days
荒壁塗(外装と内装) が4日間でできました
Base/scratch coat of earthen plaster applied in 4 days
土佐漆喰仕上げ(外壁)が2日間で行いました
The Tosa Shikkui finish was applied in two days
三和土(たたき)土間を1日に仕上げました
The traditional Japanese earthen floor was compacted in one day 
約350個のストローベイル
Approximately 350 straw bales
荒壁土作り
Preparing the bale/scratch coat of plaster
真壁
Interior
 Our Team organized by Jinnouchi-san
Noda Plaster Works
三和土(たたき)土間押さえ
Finishing the earthen floor
 
施主さんが積んだ日干し煉瓦
Adobe stacked by the home owner
日干し煉瓦で出来た土
Earth used to make the adobe 
  
  日干し煉瓦
Fermented earth and straw used to make adobe
真実の窓
Truth Window
外壁、完成
Completed Exterior
パッタン仕上げ
Pattern Finish
ノードというメーカーの窓
Excellent window detailing
洗面台~土佐漆喰押さえ
Compressed Tosa shikkui finish around sink

2014-09-20

d&b ~ 関浦デザイン アンド Bono Bagel

 
今年の夏に広島にある関浦デザインというデザイン事務所とBono Bagelというパン工房の改装工事に携わりました。特徴がストローベイルベンチと塗り壁です。
This summer I lead the renovation of a graphic design office and bakery in Hiroshima City. Construction consisted of mainly building a partition wall with window and door, building a straw bale bench, plastering several rooms and re-finishing the floors.
ベイルの散髪 Trimming Bales

 ベイル積み Stacking Bale Bench
荒壁土塗り Base Coat Application
荒壁完成 Completed base/scratch coat
中塗完成 Completed brown/middle coat
中の藁が見える真実の窓 Truth window exposing the straw
仕上げ塗 Finish application
また、グレー色の仕上げが欲しいという希望があったので、ベンチも壁も漆喰と淡路島の土、広島の砕石ダストで仕上げました。
For design work, the designer requested a grey interior finish. We achieved that with a plaster consisting of lime, earth, grey marble dust, hemp fiber and seaweed glue. 
Before and After
 床のペンキを剥がして、クリアのステンで仕上げました。 The floor was finished with clear stain.
 
お祖父さんの納屋から拾った窓です。
We also recycled an old window we found in my wife's grandparents' barn.
天井も壁も木和土大津仕上げ Kiwado Otsu Finish
洗い出し玄関 Exposed aggregate finish in entrance way
実はね、水槽用の石です。 Fish tank pebbles:)
事務所完成 The completed office

2014-08-14

Renovation of a 100 year old home in Onomichi, Hiroshima 広島県尾道にて築100年の民家の改造

The following are photographs of the restoration of 100 year old home in Onomichi, Hiroshima.
7月と8月に尾道チームが改造した築100年の民家の写真です。
現場管理: 宮本本店の宮本昌吾氏
大工: 本田徹氏
建具・内装: 小林伊吹氏

Entrance 玄関

 
廊下のBefore and after
 
脱衣室のBefore and after

新しい階段

 
2階の板間 Second Floor

2階和室 Japanese style room on the second floor


Approach

2014-08-05

James Henderson’s Earth Floor

James Henderson, of Henderson Clayworks, is a natural builder from Australia currently living and working in the northwest United States. Over the past 10 years he’s developed a reliable earthen floor system described in detail below.

1)  Compact a 100mm drainage layer, preferably volcanic rock to increase insulation.
Pumice stone
2)  Cover the drainage layer with a geotextile filter fabric. A less expensive option is shade cloth.
3)  Compact at least 100mm of road base or compactable fill, up to 25mm of the finished floor level.
4)  Apply 19mm of a course, sandy floor mix, at least 4 parts sand to 1 part clay. Load bearing strength is provided by the sand, and the amount of clay has to be reduced to eliminate shrinkage cracks.
 
James checking the mix
Application of first 19mm layer.
5)  Embed a fiberglass plastering cloth in the first layer.
Pressing in the fiberglass mesh
6)  Apply another 6mm of the floor mix with a little more clay to attain a finish thickness of 25mm.
Application of the finish 6mm layer.
The additional clay increases hardness and durability, and introduces more fine particles to get a smoother finish.
7)  Before repeating the process, remove the last 100mm of the 6mm top coat from the previous pass to expose the mesh.  This acts as a guide when applying the next 19mm layer. 
70-100mm overlap with the previous fiberglass sheet
8)  When embedding the next sheet of fiberglass plastering cloth, overlap the sheets 70-100mm.
9)  Complete the entire floor in one-day without cold joints.
Working in consecutive courses complete the floor in one day
Application Complete
10) The following day compress the floor with a wood float, preferably mahogany. The wood float should sound dry and grind, not slide.  Use Styrofoam knee-boards to prevent point loads. If the knee-boards make an indentation in the floor, the floor is still two wet and should be allowed to dry longer.  After compression with the smooth wood trowel is complete, compress the floor with a steel finishing trowel. Mist with water as needed.
Compressing Floor
11)  Allow the floor to dry for several weeks. When completely dry, apply four to six consecutive coats of raw linseed oil, one after the other, all in one day.  After the final application, do not allow the oil to pool on the surface of the floor and remove any excess oil. If allowed to pool on the floor it will take longer to dry.

To note, 19mm and 25mm were chosen because 19mm and 25mm are standard guide thicknesses in Australia.

2014-07-05

Re-thatching a rural Kabuki musical hall in Hyogo Pefecture 北層尾農村歌舞伎舞台 茅葺工事見学会

During the Edo period (1603 to 1868) rural Kabuki musicals took place during the agricultural off season; for example after the rice harvest. Originally these rural musicals took place in temporary buildings set up in rice fields or open spaces, but later came to take place in specific buildings or stages within the precincts of Shinto Shrines. Although Kabuki is believed to have originate in Kyoto in the 17th century, rural Kabuki musicals probably have their roots in a much older continental tradition.
  The following photos depict the re-thatching of  a rural Kabuki hall built in 1777 in Hyogo Prefecture. The building features a stone foundation, timber frame, bamboo lattice with earthen plaster walls, and prominent thatch roof. Ikuya Sagara-san's Kusakanmuri was responsible for re-thatching the roof.
江戸時代において農村歌舞伎は主に農閑期に行われていました。当初は川原や田んぼに仮設の小屋をかけ上映されていましたが、後に神社境内の長殿や長床と言った集会施設がその舞台として使用されるようになっていきました。この舞台も本来は北層尾厳島神社の神事で用いる長床として建てられたものですが、バッタリと呼ばれる上げ床や太末座などの舞台機構が付け加えられていき、農村歌舞伎舞台としての性格を色濃くしていったものと思われます。
 北層尾農村歌舞伎舞台は、鏡柱上部に墨書があり、安永6年(1777)に建てられました。1970年に兵庫県指定重要有形民俗文化財に指定されました。相良育弥氏が運営しているくさかんむりが葺き替え工事を行いました。
見学会レジュメに参考